PHASE SHIFTING TRANSFORMER CONSTRUCTION



In general, construction requirements for PSTs should be in accordance with the requirements for power transformers, as covered in IEEE Std C57.12.00-2000 and other applicable IEEE standards based on kV and kVA ratings, with the following exceptions or additions.


Enclosed throat connections
Enclosed throat connections in fully assembled condition must meet the pressure and vacuum requirements of PST tanks for all designs that subject the enclosed throat connection to the same operating pressures and vacuum levels as the transformer tank.

Liquid insulation and preservation system 
Liquid insulation and preservation systems shall be in accordance with IEEE Std C57.12.00-2000 with the following addition.

Two tank designs with enclosed liquid-filled throat connection
Enclosed liquid-filled throat connections may be either sealed from each tank or opened to the insulating fluid from one or both tanks. Enclosed throat connections shall be designed for installation or removal without the need to jack or move either or both of the transformer tanks and shall accommodate thermal expansion and contraction of the throat assembly and both tanks. For a sealed throat system that isolates the insulating fluid, the throat connections require a separate conservator system.

For a system where the throats are not directly connected to a main tank and the isolation of the insulating fluid in different compartments is not important, the throats may be connected to the conservator system of the main tank. If this approach is used, the user should be aware that the use of oil and gas analysis to isolate problems will be complicated.

For throat connections that place barriers between both the tanks and the throat, the throat shall be equipped with the following accessories:

— Gas accumulation relay
— Pressure relief device/relay
— Liquid filling and draining valves
— Rapid rate of rise relay
— Liquid level gauge

1 comment:

  1. you can't just design houses and get paid for it unless you're a design professional. there are a lot of things you will have to consider not only aesthetics. you'd have to follow building codes and only an experienced architect should do that. if you want you can learn from a knowledgeable architect if you're really that interested. wait till you're old enough to study architecture, if that's what u really want
    http://www.allevaconstruction.com/services/construction-design.html

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...

TOP COUNTRIES